- KONSEP YANG TERINTEGRASI DENGAN KAWASAN APARTEMEN, HOTEL, PERKANTORAN DAN COMMERCIAL AREA
- FASILITAS LENGKAP SETARA BINTANG 5
- KEPEMILIKAN HAK MILIK STRATA TITLE
- DESIGN BUILDING FUTURISTIC OLEH ART DESIGN INDONESIA
- BERADA DI DAERAH DENGAN PERTUMBUHAN INVESTASI YANG PESAT
- MASUK DALAM WILAYAH PENGEMBANGAN KAWASAN CBD
- DIAPIT TOL LINGKAR LUAR (TB SIMATUPANG) DAN TOL DALAM KOTA
- KEMUDAHAN AKSES DAN TRANSPORTASI
- RENCANA RUAS TOL PASAR MINGGU - CASABLANCA YANG TERINTEGRASI DGN KORIDOR BUSWAY
- RENCANA PELEBARAN JALAN 18 METER
- BEBAS BANJIR & BEBAS 3 IN 1
PROJECT SUMMARY
Total Project Area : 28.497 m2
Total Office Area | : | 5.638 m2 |
Total Floor | : | 25 floors |
Total Semi Gross | : | 28.667 m2 |
Total Gross Area | : | 34.230 m2 |
Total Unit | : | 253 units |
Footprint Area | : | 1.071.83 m2 up to 1.387.25 m2 |
Basement Area Main Contractor : |
: | 11.030 m2 (@ 5.515 m2) PT. PP Tbk (Persero) |
Hand Over | : | Q2 2015 |
Developed by | : | PT SEKAR ARTHA SENTOSA |
Architecture Consultant | : | ART DESIGN INDONESIA |
Structure Consultant | : | DAVYSUKAMTA & PARTNERS |
M&E Consultant | : | PT MALMAS MITRA TEKNIK |
Landscape Consultant | : | PT CIPTA PESONA HIJAU |
Quantity Surveyor | : | PT KORRA ANTAR BUANA |
BUILDING SPECIFICATION
1. Main Lobby | |
Floor | : Marble & Granite |
Wall | : Marble & Granite |
Ceiling | : Painted gypsum board with drop ceiling design (ceiling height 8.5 m) |
Window | : Glass & Aluminum window frame |
Sliding door | : Clear tempered glass |
Floor
: Structural finish with smooth plastered
Wall
: Hebel wall bare finished
Ceiling
: Not provided
Window
: Glass & Aluminum window wall frame
Height
: 3.7 m (floor to floor)
3.Typical Lift Lobby
Floor
: Homogeneous tile
Wall
: Marble & Granite
Ceiling
: Painted gypsum board with drop ceiling design
4.Typical Common Corridor
Floor
: Homogeneous tile
Wall
: Painted wall
Ceiling
: Painted gypsum board
5.Elevators
Passenger
: 6 high-speed elevators (Low & High zone system)
Service
: 1 medium speed elevator
Car Park
: 1 low speed elevator
6.Telephone Lines
: 1 line provided for each office unit (expandable)
7.Parking System
Basement
: 117 lots car park & 110 lots motorcycle
Semi Basement
: 94 lots car park & 110 lots motorcycle
Outdoor Parking
: 40 lots car park
8.Rest rooms
female
: 3 water closets & 3 lavatories on each floor
Male
: 2 water closets, 3 urinoirs & 3 lavatories on each floor
executive toilet / handicap
: 1 water closets, 1 shower & 1 lavatory
fitting
: ex. TOTO or equivalent
Vanity
: Granite, lavatory ex TOTO or equivalent
Urinary
: ex. TOTO or equivalent
Toilet cubicle
: HPL partions
Floor & Wall
: Ceramic tile
Ceiling
: Painted gypsum board
9.Pantry
Floor & Wall
: Ceramic tile
sink
: Stainles steel sink bowl
10.Mechanical / electrical & Fire safety System
Electric power, fire sprinklers, Smoke & heat detectors, air Conditioning installation on each office units
Fire Hydrant & Fire extinguisher on each floor
11. Back-Up Genset
100% (all units are covered in emergency)
12.Security System
Security checkpoint at main entrance and lobby entrances.
Doors monitoring, CCTV, 24 hours security services, security control room.
13. Facilities
- Sport Club
- Fine dining
- Food Court
- Canteen
- Banking Halls
- Prayer Rooms